Construction Stage 1 – Base

Most of the work that comprises this stage of the construction will be hidden when the house is completed

That doesn’t mean it should be ignored as it has a significant impact on the completed house.

This work package can be subdivided as follows:

Site Set Up

  • Temporary Fencing. Most councils now require 1.8m high fencing of sites.
  • Power supply. Originally a temporary box on a pole at the start, These days installation may be delayed until slab construction and then the final box put in at the finished position.
  • Portable Toilet 
  • Silt barriers Only on sites where silt may be washed off site. Can be hay bales or a geotextile (like a shade cloth fence)

Excavation

  • Site clearance Removal of topsoil, vegetation and any rubbish.
  • Initial peg out. To provide enough information to allow excavation works.
  • Cut and fill Providing one or more level ‘platforms’ that the house will be built on.
  • Retaining walls Any major retaining walls that are required to either support or retain the building ‘platform’. Other retaining walls will often be part of landscaping.

Drainage and Pipework

  • Building set out.
  • Sewage and Drainage Pipes.

Slab Construction

For more about Construction Stages check out this link: Background

To find out about Stage Payments see this link: Progress Payments

 